SASKATOON — The City of Saskatoon will be closing the northbound lanes of Warman Road between 33rd Street East and Circle Drive East for resurfacing work. This project will be completed in two phases:
- Aug. 23 and 24 – from 33rd Street East to Cavers Street
- Sept. 6 and 7 – from 7th Avenue North to Circle Drive East
During construction, southbound lanes will accommodate two-way traffic to maintain access. Drivers are reminded to watch for signage and plan for possible delays, and to use the zipper merge when approaching the work zone to keep traffic flowing smoothly.
Resurfacing is done when a road develops structural or pavement issues. The process removes the existing asphalt surface and replaces it with fresh asphalt. This extends the life of the roadway and provides a smoother, safer drive.
Saskatoon Transit may be affected by these detours. Transit service alerts and real-time bus information are available on third-party apps like Transit and Google Maps Transit on desktop.
For more information about current road restrictions and construction, visit saskatoon.ca/construction.