1 / 1
Road Rebuilding – The first concrete roadway in the City of Yorkton gets laid down in front of the Parkland Mall. The road is built by the largely automated machine above, which follows guide strings as the concrete vibrates through and goes through a slip form. The reason is going with concrete is longevity, as the projected life of the road is thirty to forty years. While rain threatened the project, the build otherwise went smoothly.
Advertisement