Skip to content

Report a Typo or Mistake

Optional

Optional

Optional

TransCanada is inspecting its pipe in anticipation of Keystone XL beginning second half 2019
https://www.sasktoday.ca/southeast/local-news/transcanada-is-inspecting-its-pipe-in-anticipation-of-keystone-xl-beginning-second-half-2019-4126184
Verify
push icon
Be the first to read breaking stories. Enable push notifications on your device. Disable anytime.
No thanks