Skip to content

Local News

21-year-old man dead after rollover near Muenster

21-year-old man dead after rollover near Muenster

A single vehicle rollover on a gravel road around five kilometers northwest of Muenster off Highway 368 resulted in the death of a 21-year-old man from Humboldt.
Three charged, crack cocaine and illegal cannabis seized after traffic stop

Three charged, crack cocaine and illegal cannabis seized after traffic stop

Three individuals, all residents of Lloydminster, have been arrested and charged after traffic stop finds drugs.
Water Ridge Park playground to be ready mid-August, grand opening planned

Water Ridge Park playground to be ready mid-August, grand opening planned

Water Ridge Park’s new pickleball court is opened to the public and the new playground isn’t far behind, with ground installation planned to be completed and fences removed by mid-August.
Forestry farm's Malcolm helped raise awareness of cougars

Forestry farm's Malcolm helped raise awareness of cougars

Malcolm was an amazing ambassador says Saskatoon Forestry Farm & Zoo manager.
Two vehicles per day being stolen: Battlefords RCMP

Two vehicles per day being stolen: Battlefords RCMP

Battlefords RCMP say vehicles are being stolen at the rate of about two per day.
Black Lake First Nation mourning Chief Archie Robillard

Black Lake First Nation mourning Chief Archie Robillard

Black Lake First Nation Chief Archie Robillard passed away Thursday, Aug. 5, at the age of 60.
Humboldt resident wins $100,000 in lottery

Humboldt resident wins $100,000 in lottery

Humboldt resident Marlene Haeusler won $100,000 from a Western Max lotto ticket.
Pedestrian seriously injured in hit and run - Meadow Lake

Pedestrian seriously injured in hit and run - Meadow Lake

Meadow Lake RCMP are looking for a white van that struck and seriously injured a pedestrian Friday.
Northeast chambers producing videos encouraging people to shop local

Northeast chambers producing videos encouraging people to shop local

The Nipawin, Tisdale and Melfort chambers of commerce are joining forces to produce videos encouraging people to shop locally.
Carrot River Main Street paving project could be $100,000 less than expected

Carrot River Main Street paving project could be $100,000 less than expected

CARROT RIVER — Completion for Carrot River’s Main Street paving project is set for the end of August to early September with an estimated cost of $892,000 – $100,000 less than mid-July estimates.
push icon
Be the first to read breaking stories. Enable push notifications on your device. Disable anytime.
No thanks